Meeting plan

Lion / Build It Up, Knock It Down

Build It Up, Knock It Down Den Meeting Plan

Scouts build a structure with an adult partner, build another structure with the den or family, and make something intended to be knocked down. The three selected activities map to those separate steps.

Supported requirements
1, 2, 3

Adventure: Build It Up, Knock It Down
Rank: Lion (kindergarten)
Status: Elective
Selected activities: Build a block house with an adult partner; make a cup pyramid with the den; build and topple a domino line
Suggested meeting duration: 60 minutes
Estimated leader preparation: 10-20 minutes to check and sort reusable blocks, cups, and dominoes and prepare low tables; allow 10 minutes for collection and cleanup. Assumes up to six Scouts with adult partners and materials already on hand.

About this adventure

Scouts build a structure with an adult partner, build another structure with the den or family, and make something intended to be knocked down. The three selected activities map to those separate steps. See the adventure page for approved plans and handouts..

Safety and respect

Meeting preparation

Overall preparation effort: Low if all reusable materials are on hand. The combined workload is collecting three sets, checking pieces, setting up tables, and returning materials. A shopping trip for missing sets makes the affected activity and overall effort at least Medium.

Supplies

Pre and post meeting activities for scouts

Before

Bring a Lion adult partner. No advance building task is needed.

After

No additional work is required if the Scout participated in all three builds. If a meeting activity is missed or unfinished, arrange a later build with the adult partner or den and notify the leader when it is complete.

Completion checklist

Sample Agenda

Time Activity Actionable leader notes
0:00-0:05 Welcome and opening Pair each Scout with their adult partner and review the build-area boundaries.
0:05-0:20 Partner block house Partners build a small house together. Let the Scout choose pieces and place them. Requirement 1.
0:20-0:25 Reset and movement break Return blocks to the tub and stretch before moving to the shared activity.
0:25-0:40 Den cup pyramid Build one shared pyramid, taking turns adding cups and rebuilding after a gentle collapse. Requirement 2.
0:40-0:45 Transition to domino area Move cups away, clear the floor, and demonstrate the stand-back boundary.
0:45-0:55 Build and topple Work together to arrange a short domino line and topple it with a gentle first push. Requirement 3.
0:55-1:00 Closing and completion check Ask what the den built together, thank partners, and check each requirement from participation.

Leader notes and talking points

Welcome and opening (0:00-0:05)

Partner block house (0:05-0:20)

Reset and movement break (0:20-0:25)

Den cup pyramid (0:25-0:40)

Transition to domino area (0:40-0:45)

Build and topple (0:45-0:55)

Closing and completion check (0:55-1:00)